|
|
Home | Forums |
Downloads | Gallery |
News & Articles | Resources |
Jobs | FAQ |
| Join |
Welcome !
|
32 Users Online (31 Members):
Show Users Online
- Most ever was 626 - Mon, Jan 12, 2015 at 2:00:17 PM |
Forums
Forums >> General Discussion >> Revit Project Management >> Large Project CD Phase sheet/files setup for Details.
|
|
active
Joined: Thu, Apr 12, 2007
2 Posts No Rating |
I am looking for suggestion an how others have setup sheet/files in the CD phase for details. The main concern is keeping the the central files at a managable size. We have a 825,000 sqft hospital project. It is divided up into 3 central files. One for the Shell and core elements and two file for interior architectural elemants. The one interior element file is for floors 0-3. the second is for floors 4 -11. Floors 4 -11 are a tower that sits ontop of floors 0-3 which has a larger foot print. We are at the begining of the CD phase. Currently each of the three central files average 225 megs. The shell and core is linked into each of the interior architectural central files. This link does slow down the performance of the 2 interionr architectural elemant central files. How are others dealing with detail sheet/files setup in the CD Phase with this size of project.
|
This user is offline |
|
 |
|
active
Joined: Sat, Dec 13, 2003
168 Posts
 |
I would work in one model using worksets to break up the model, then selective open to open only what you need to work on. Linking models is not really designed for the way you are using them, except for in 2008 you can bind them so The approach some are taking is to have your models bound as groups in your project, then you can work on the sep rvt, load it as a group, then swap it out. we are using this method for typical hotel rooms.
|
This user is offline |
|
 |
active
Joined: Thu, Apr 12, 2007
2 Posts No Rating |
We were not wanting to break the model up however we needed to for a variety of reasons, team size, file size, STC issues, Revit processing issues. We worked with autodesk revit on best practices for breaking up of the model. Combining the three files at this point will make a 550 mg file. We will look into binding the modes as groups and making a separate rvt file. I am assuming the idea of having the separate models in as bound groups iis ,we would the creat our details and detail call out in this file. Yes?
|
This user is offline |
|
 |
 |
Similar Threads |
Changing phase for a large section of a project |
Revit Building >> Technical Support
|
Mon, Nov 12, 2012 at 10:20:27 PM
|
2
|
Details within sheets on the project browser |
General Discussion >> Wishlist
|
Thu, Sep 8, 2005 at 7:49:34 PM
|
0
|
Central File Setup |
Revit Building >> Technical Support
|
Wed, Apr 5, 2006 at 5:01:15 PM
|
3
|
Moving Details to another sheet |
Revit Building >> Technical Support
|
Wed, May 13, 2009 at 9:05:04 PM
|
2
|
Project Browser |
Revit Systems >> Technical Support
|
Mon, Jan 19, 2015 at 1:54:23 PM
|
1
|
 |
|
Site Stats
Members: | 1896832 | Objects: | 22619 | Forum Posts: | 152076 | Job Listings: | 3 |
|