|
|
Home | Forums |
Downloads | Gallery |
News & Articles | Resources |
Jobs | FAQ |
| Join |
Welcome !
|
49 Users Online (48 Members):
Show Users Online
- Most ever was 626 - Mon, Jan 12, 2015 at 2:00:17 PM |
Forums
Forums >> Community >> Newbies >> Hanger Rod
|
|
active
Joined: Tue, Jul 11, 2017
0 Posts
|
Hello,
I am working on a job that was previously modeled with conduit hangers. I need the rod length to be 2" above the pan deck. Is there a way to modify the family to automatically look for the deck and attach to it? I am going through and individually moving every rod to the length I need.
Thanks
|
This user is offline |
|
|
|
site moderator|||
Joined: Tue, May 16, 2006
13079 Posts
|
I don't know of a way to see the deck and attach to that but if you have a structural level like TOS, you could use that.
|
This user is offline |
|
|
|
Similar Threads |
Threaded rod |
General Discussion >> Wishlist
|
Fri, Aug 18, 2017 at 1:43:28 PM
|
10
|
Parametric Pipe hanger |
Revit Building >> Technical Support
|
Tue, Sep 2, 2014 at 3:58:06 PM
|
4
|
Hanger Point Loads |
Revit Systems >> Technical Support
|
Tue, Apr 7, 2015 at 8:00:02 AM
|
1
|
Using a Steel Angle as a Hanger or Column |
Revit Structure >> Tips & Tricks
|
Mon, Oct 12, 2009 at 7:04:25 PM
|
3
|
CLEVIS & TIE ROD |
Revit Structure >> Technical Support
|
Wed, Nov 14, 2018 at 10:21:56 AM
|
2
|
|
|
Site Stats
Members: | 2030850 | Objects: | 23003 | Forum Posts: | 152205 | Job Listings: | 3 |
|