Sun, Jan 20, 2013 at 9:15:59 PM | Tagging & Scheduling grouped doors

#1

fabioloretti


active

Joined: Thu, Jun 25, 2009
64 Posts
3 Stars: 2 Votes


Hi everyone, I'm facing a problem that I'd like to find a solution without major workarounds.

I'm doing a commercial building where the core is a group placed on 4 out of the 5 floors. I know the only parameter I can change on grouped doors is the mark, nothing else, right?

My door tag shows the floor (1F, 2F, 3F, etc.) and the door number, both using the same parameter: Mark. I've also got a callout to one of the typical cores for detailing but on this callout instead of showing the floor and the door number I want to show TF (for Typical Floor) and the door number.

I'd like to keep my floor information (1F, 2F, 3F, etc.) for schedule purposes and use another parameter to display the TF but I don't see a way to not show the floor and still show the door number since I can't split these two into two separate ones.

Any help is greatly appreciated.



Attached Images

115172_Capture.JPG

This user is offline

 

Sun, Jan 20, 2013 at 10:39:14 PM | Tagging & Scheduling grouped doors

#2

CDWdavid


active

Joined: Mon, Aug 4, 2008
153 Posts
5 Stars: 5 Votes


Here is my way to work around this.

First, try to assign those 12 doors in the core to the highest door numbers with a gap, which means on the first floor, if you have 80 doors, other doors numbered from D01 to D68, the doors in the core started from D81 to D92; on the second floor, if you have 72 doors, other doors numbered from D01 to D60, the doors in the core started from D81 to D92 same as the 1st floor; on the typical floors, if you have 65 doors, other doors numbered from D01 to D53, the doors in the core started from D81 to D92 same as the 1st floor, and so on so forth,Then, on the floor plan sheets, which I assumed should be on 1/8" scale, hide those doors in the core, with an enlarged plan eference as you had 1/A451, and a note "SEE ENLARGED PLAN FOR DOOR NUMBERS".Then on the enlarged plan, I assumed should be on 1/4" scale, you can number those 12 doors from T/D81 to T/D92.

This way the door numbering gap will be shown on the door schedule as well, you can have a note on the door schedule, to refer back to the enlarged plan.Hoping that this can solve your problem.


This user is offline

 

Sun, Jan 20, 2013 at 10:49:59 PM | Tagging & Scheduling grouped doors

#3

fabioloretti


active

Joined: Thu, Jun 25, 2009
64 Posts
3 Stars: 2 Votes


Hi CDWdavid, thanks for taking the time to read my post and replying.

Sorry, I just want to understand: do you hide the tags in the 1/8 floor plan and show door numbers only in the enlarged one?


This user is offline

 

Sun, Jan 20, 2013 at 11:21:20 PM | Tagging & Scheduling grouped doors

#4

CDWdavid


active

Joined: Mon, Aug 4, 2008
153 Posts
5 Stars: 5 Votes


Yes, I think you have to hide those doors in the core on 1/8" scale, and manually type those on the 1/4" scale enlarged plan with T/D81 for example.Otherwise your door schedule can not be shown correctly.I have not tried it, but you door schedule might have 1F/D01, .... T/D81; 2F/D01, ......, T/D81, 3F/D01, T/D81. It might create sorting problem.It is better to have the door schedule shown like the following: 1F/D01, .... 1F/D81; 2F/D01, ......, 2F/D81; 3F/D01, 3F/D81, with a note "SEE ENLARGED PLAN FOR DOOR NUMBERS FROM D81 TO D92".


This user is offline

 

Sun, Jan 20, 2013 at 11:38:35 PM | Tagging & Scheduling grouped doors

#5

fabioloretti


active

Joined: Thu, Jun 25, 2009
64 Posts
3 Stars: 2 Votes


Hmm... I see your point... but how would you rename the doors in one of the floors as a "T" door (to use in the callout) and still keep the floor information (1F or 2F for example) so the schedule shows all of them?


This user is offline

 

Sun, Jan 20, 2013 at 11:49:22 PM | Tagging & Scheduling grouped doors

#6

CDWdavid


active

Joined: Mon, Aug 4, 2008
153 Posts
5 Stars: 5 Votes


On the 3rd floor, for example, you will have 3F/D81, on the plan, and hide the door tag on the sheet.

Then on the enlarged plan, you could just insert a door tag manually and label it as "T/D81".


This user is offline

 

Mon, Jan 21, 2013 at 4:41:34 AM | Tagging & Scheduling grouped doors

#7

Pavan


active
Pavan Avatar

Joined: Sat, Mar 19, 2005
157 Posts
4.5 Stars: 3 Votes


Create a new door tag with a new 'Mark' shared parameter and use this tag in your enlarge plan.



Attached Images

115180_Door_Tag.jpg

-----------------------------------

Pavan Reddy

Revit Manager

Intelligence is not always knowing the answers, it's always asking the questions.

This user is offline

 

Mon, Jan 21, 2013 at 11:13:23 AM | Tagging & Scheduling grouped doors

#8

CDWdavid


active

Joined: Mon, Aug 4, 2008
153 Posts
5 Stars: 5 Votes


Thanks Pavan,

That's a perfect solution.

I'll try it in the future.


This user is offline

 

Mon, Jan 21, 2013 at 11:26:00 AM | Tagging & Scheduling grouped doors

#9

WWHub


site moderator|||

Joined: Tue, May 16, 2006
13079 Posts
3.5 Stars: 390 Votes


Be aware that this new tag will not work the same in schedules..... The regular tag will be in a different column.


This user is offline

 

Mon, Jan 21, 2013 at 4:54:37 PM | Tagging & Scheduling grouped doors

#10

fabioloretti


active

Joined: Thu, Jun 25, 2009
64 Posts
3 Stars: 2 Votes


Awesome!!! Thanks for all the answers, guys. Really helpful. :-)


This user is offline

 

Search this ThreadSearch this Thread | Page 1 of 1 |



Similar Threads

Thread/Thread Starter

Forum

Last Post

Replies

Shcedulling design option doors & windows from a linked model

Revit Building >> Technical Support

Mon, Mar 19, 2018 at 2:57:51 PM

1

deleating doors from project and tagging problems

Community >> Newbies

Thu, Dec 4, 2014 at 2:04:10 AM

6

Door parameters not scheduling or tagging in double door.

Revit Building >> Technical Support

Mon, Sep 26, 2011 at 3:29:50 PM

5

Door & Window Schedules - how to schedule existing doors and windows

Revit Building >> Technical Support

Tue, Feb 3, 2009 at 11:11:39 AM

2

it's tagging existing doors

Revit Building >> Technical Support

Mon, Apr 2, 2007 at 1:50:43 PM

4

Site Stats

Members:

1997262

Objects:

22885

Forum Posts:

152179

Job Listings:

3

Sponsored Ads

Home | Forums | Downloads | Gallery | News & Articles | Resources | Jobs | Search | Advertise | About RevitCity.com | Link To Us | Site Map | Member List | Firm List | Contact Us

Copyright 2003-2010 Pierced Media LC, a design company. All Rights Reserved.

Page generation time: 0.5979

Login

User Name:

Password:

Remember Me  

Forgot Password?

Search Forums

Advanced Search

Search Forums

Advanced Search


Clear Highlights


Clear Highlights