RevitCity.com Logo

Home  |  Forums  |  Downloads  |  Gallery  |  News & Articles  |  Resources  |  Jobs  |  FAQ  |  SearchSearch  |  Join  |  LoginLogin

Welcome !

255 Users Online (27 Members): Show Users Online - Most ever was 712 - Sat, Aug 8, 2026 at 7:11:41 PM

 

Forums

Forums >> Revit Structure >> Technical Support >> pivot point of compass view cube

Search this ThreadSearch this Thread | Page 1 of 1 |

Fri, Oct 12, 2012 at 10:23:49 AM | pivot point of compass view cube

#1

937delta


active

Joined: Fri, Nov 11, 2011
7 Posts
No Rating


I am working on a model which has a small building located within a site. The view area is mostly taken up with a .dwg file in the back ground. The only way I seem to 'temporarly' move the pivot point is to zoom far out within 3d view of the model, I can select a roof or wall of the small building and if I spin the compass the pivot point will move to the centre of this element and thus the whole model will rotate about this point. This would be how I would move the pivot point. However I am very far out and want to spin this model about this point close up. However when I start to zoom in there is a point were the pivot point resorts back to the centre of the main model. As usual with Revit each little simple problem can take dayyysss to work out! Anybody come across this before?


This user is offline

 

Fri, Oct 12, 2012 at 10:41:03 AM | pivot point of compass view cube

#2

WWHub


site moderator|||

Joined: Tue, May 16, 2006
19889 Posts
3.5 Stars: 404 Votes


Imported DWG files can cause problems like this.   Do you really need it on?  Did you put it in a seperate workset so it is easily turned on and OFF?  Do you know how to use a scope box?


This user is offline

 

Fri, Oct 12, 2012 at 10:59:33 AM | pivot point of compass view cube

#3

937delta


active

Joined: Fri, Nov 11, 2011
7 Posts
No Rating


Should I have just linked the drawing rather than importing it? I will try a scope box - Thanks


This user is offline

 

Fri, Oct 12, 2012 at 11:14:11 AM | pivot point of compass view cube

#4

WWHub


site moderator|||

Joined: Tue, May 16, 2006
19889 Posts
3.5 Stars: 404 Votes


I should not have limited it to imported.... it is all DWG files that are too large.  I recommend that you always put imports and links in seperate worksets so they can easily be controlled.

 

BTW - You can do the worksets anytime.


This user is offline

 

Search this ThreadSearch this Thread | Page 1 of 1 |



Similar Threads

Thread/Thread Starter

Forum

Last Post

Replies

Property Boundary Creation

Revit Building >> Technical Support

Mon, Dec 1, 2008 at 10:02:45 AM

0

Filled Region Background Color - Where is it coming from?

Revit Building >> Technical Support

Mon, Feb 15, 2016 at 2:24:53 PM

3

How to pivot about centroid of model?

Revit Building >> Technical Support

Wed, Feb 4, 2009 at 3:54:27 PM

11

setting project true north

Revit Building >> Technical Support

Fri, Oct 31, 2014 at 5:15:57 PM

2

Variable Angle Door Swing breaks at 150°

Revit Building >> Technical Support

Tue, Mar 11, 2014 at 12:56:25 PM

0

Site Stats

Members:

2167189

Objects:

23399

Forum Posts:

152368

Job Listings:

0

Sponsored Ads

Home | Forums | Downloads | Gallery | News & Articles | Resources | Jobs | Search | Advertise | About RevitCity.com | Link To Us | Site Map | Member List | Firm List | Contact Us

Copyright 2003-2010 Pierced Media LC, a design company. All Rights Reserved.

Page generation time: 0.5180

Login

User Name:

Password:

Remember Me  

Forgot Password?

Search Forums

Advanced Search

Search Forums

Advanced Search


Clear Highlights


Clear Highlights