Forums >> Revit Building >> Technical Support >> Schedule material mark in schedule type other than material Schedule?
|
|
active
Joined: Sat, Oct 30, 2010
2 Posts No Rating |
I hope someone can address it this.In our project we have a material schedule which is used to describe all of the materials used in the project. (We are doing this because we have multple projects of the same type and client and are looking for consistency from project to project). That material schedule work perfectly. Some of those materials are assigned to pieces of furniture in the project. We also have to provide a furniture plan, with corresponding marks for the furniture type. The problem comes in when we schedule those pieces of furniture. In the furniture schedule we need to show what materials pieces of the furniture are, ie seat back fabrick, seating material, etc. When we schedule it the schedule seems to only read the Material Name. Is there a way to direct the furniture schedule to read the sub parameters of the material? Meaning: Can i have the furniture schedule read the material "mark" field similar to how the material tags read that field.Example Material:Material Name: FA2 - 09720 - Fabric - Dinning Pullman Seat BackMat. Mark = FA2Mat. Manufactuer = " "Mat Keynote = 09720so on and so forth.We can't rename the fabric to just he mark because it would make it difficult in apply the material because we would have to refer to the description field each time we applied it or if a newer person was working on it it would really slow the project down. In the schedule however we just need to refer to the material by it's mark.Is there anyway to do this?I hope that i've explained it clearly.
|
This user is offline |
|
|
|
Similar Threads |
Schedule material mark in door schedule - Revit 2014 |
Revit Building >> Technical Support
|
Fri, Jan 19, 2018 at 2:57:03 PM
|
7
|
material tag schedule problem |
Revit Building >> Technical Support
|
Sat, Mar 25, 2017 at 7:50:36 AM
|
1
|
Material Schedule |
Revit Building >> Technical Support
|
Thu, Mar 19, 2009 at 11:29:22 AM
|
0
|
Differences between Schedule and Material Takeoff Schedule? |
Revit Building >> Technical Support
|
Thu, Feb 9, 2012 at 7:31:53 AM
|
1
|
window schedule by mark and count |
Revit Building >> Technical Support
|
Wed, Jun 4, 2014 at 2:31:52 PM
|
5
|
|
|
Site Stats
Members: | 2061230 | Objects: | 23081 | Forum Posts: | 152248 | Job Listings: | 3 |
|