RevitCity.com Logo

Home  |  Forums  |  Downloads  |  Gallery  |  News & Articles  |  Resources  |  Jobs  |  FAQ  |  SearchSearch  |  Join  |  LoginLogin

Welcome !

63 Users Online (61 Members): Show Users Online - Most ever was 626 - Mon, Jan 12, 2015 at 2:00:17 PM

 

Forums

Forums >> Revit Building >> Technical Support >> Schedule material mark in schedule type other than material Schedule?

Search this ThreadSearch this Thread | Page 1 of 1 |

Wed, Jun 22, 2011 at 3:59:07 PM | Schedule material mark in schedule type other than material Schedule?

#1

sunz


active

Joined: Sat, Oct 30, 2010
2 Posts
No Rating


I hope someone can address it this.In our project we have a material schedule which is used to describe all of the materials used in the project. (We are doing this because we have multple projects of the same type and client and are looking for consistency from project to project). That material schedule work perfectly. Some of those materials are assigned to pieces of furniture in the project. We also have to provide a furniture plan, with corresponding marks for the furniture type. The problem comes in when we schedule those pieces of furniture. In the furniture schedule we need to show what materials pieces of the furniture are, ie seat back fabrick, seating material, etc. When we schedule it the schedule seems to only read the Material Name. Is there a way to direct the furniture schedule to read the sub parameters of the material? Meaning: Can i have the furniture schedule read the material "mark" field similar to how the material tags read that field.Example Material:Material Name: FA2 - 09720 - Fabric - Dinning Pullman Seat BackMat. Mark = FA2Mat. Manufactuer = " "Mat Keynote = 09720so on and so forth.We can't rename the fabric to just he mark because it would make it difficult in apply the material because we would have to refer to the description field each time we applied it or if a newer person was working on it it would really slow the project down. In the schedule however we just need to refer to the material by it's mark.Is there anyway to do this?I hope that i've explained it clearly.

This user is offline

 

Search this ThreadSearch this Thread | Page 1 of 1 |



Similar Threads

Thread/Thread Starter

Forum

Last Post

Replies

Schedule material mark in door schedule - Revit 2014

Revit Building >> Technical Support

Fri, Jan 19, 2018 at 2:57:03 PM

7

material tag schedule problem

Revit Building >> Technical Support

Sat, Mar 25, 2017 at 7:50:36 AM

1

Material Schedule

Revit Building >> Technical Support

Thu, Mar 19, 2009 at 11:29:22 AM

0

Differences between Schedule and Material Takeoff Schedule?

Revit Building >> Technical Support

Thu, Feb 9, 2012 at 7:31:53 AM

1

window schedule by mark and count

Revit Building >> Technical Support

Wed, Jun 4, 2014 at 2:31:52 PM

5

Site Stats

Members:

2061230

Objects:

23081

Forum Posts:

152248

Job Listings:

3

Sponsored Ads

Home | Forums | Downloads | Gallery | News & Articles | Resources | Jobs | Search | Advertise | About RevitCity.com | Link To Us | Site Map | Member List | Firm List | Contact Us

Copyright 2003-2010 Pierced Media LC, a design company. All Rights Reserved.

Page generation time: 0.7783

Login

User Name:

Password:

Remember Me  

Forgot Password?

Search Forums

Advanced Search

Search Forums

Advanced Search


Clear Highlights


Clear Highlights