RevitCity.com Logo

Home  |  Forums  |  Downloads  |  Gallery  |  News & Articles  |  Resources  |  Jobs  |  FAQ  |  SearchSearch  |  Join  |  LoginLogin

Welcome !

680 Users Online (41 Members): Show Users Online - Most ever was 3914 - Wed, Aug 26, 2026 at 4:53:14 AM

 

Forums

Forums >> Revit Building >> Technical Support >> AREA SCHEDULE INCLUDING WALLS

Search this ThreadSearch this Thread | Page 1 of 1 |

Mon, Sep 12, 2005 at 10:36:44 PM | AREA SCHEDULE INCLUDING WALLS

#1

Sparrow


active

Joined: Wed, Aug 24, 2005
11 Posts
No Rating


I AM TRYING TO CREATE A SCHEDULE OF AREAS FOR THE WHOLE SITE, INCLUDING OUTDOOR AREAS, THAT LOOKS LIKE THE ONE ATTACHED. PROBLEM: HOW DO YOU TALLY THE AREA THAT THE WALLS TAKE UP? AND HOW DO I GET THE SCHEDULE FORMATTED LIKE THIS, WITH A SUBTOTAL FOR COVERED PLAY AREA?

Attached Images

AREA SCHEDULE.bmp

This user is offline

 

Tue, Sep 13, 2005 at 9:50:03 AM | RE: AREA SCHEDULE INCLUDING WALLS

#2

TomDorner


active

Joined: Sun, Apr 25, 2004
1207 Posts
4.5 Stars: 25 Votes


I would use an area plan or plans. Revit comes with two area plan types defined. Gross and Rentable. In area plans these two types have rules that apply to them and you can have Revit automatically adjust your area line location based on these rules. Gross for instance places the area line at the exterior of the wall. Rentable adjusts the line locations based on BOMA standards. You can define your own are type plan in Revit. Doing so will result in a plan you simply have to place area lines in as the rules will no longer apply that are built-in to Revit/ Be sure to uncheck the apply rules box when placing area lines in these plans. To schedule like you want you may have to add a parameter (database field) to your schedule that you can sort and group on. Since Revit is a database it sorts and groups similar to other database applications. There are limits on formatting though and if you can live with these you can most likely accomplish what you want 100% inside of Revit. HTH Tom

This user is offline

View Website

Search this ThreadSearch this Thread | Page 1 of 1 |



Similar Threads

Thread/Thread Starter

Forum

Last Post

Replies

Scheduling based on another Schedule

Revit Building >> Technical Support

Sat, Jun 16, 2007 at 8:56:37 AM

2

Phantom Area Boundaries

Revit Building >> Technical Support

Tue, Sep 29, 2009 at 1:12:12 PM

8

Room Tags That Calculate [ 1 2 ]

Revit Building >> Technical Support

Mon, Feb 17, 2014 at 3:28:45 PM

17

area tag visibility without linked view

Revit Building >> Technical Support

Fri, Feb 5, 2016 at 7:43:26 AM

5

new Area Scheme question

General Discussion >> Revit Project Management

Tue, Jun 20, 2017 at 4:11:49 PM

10

Site Stats

Members:

2175517

Objects:

23399

Forum Posts:

152402

Job Listings:

0

Sponsored Ads

Home | Forums | Downloads | Gallery | News & Articles | Resources | Jobs | Search | Advertise | About RevitCity.com | Link To Us | Site Map | Member List | Firm List | Contact Us

Copyright 2003-2010 Pierced Media LC, a design company. All Rights Reserved.

Page generation time: 0.4095

Login

User Name:

Password:

Remember Me  

Forgot Password?

Search Forums

Advanced Search

Search Forums

Advanced Search


Clear Highlights


Clear Highlights