RevitCity.com Logo

Home  |  Forums  |  Downloads  |  Gallery  |  News & Articles  |  Resources  |  Jobs  |  FAQ  |  SearchSearch  |  Join  |  LoginLogin

Welcome !

216 Users Online (215 Members): Show Users Online - Most ever was 626 - Mon, Jan 12, 2015 at 2:00:17 PM

 

Forums

Forums >> Workflow & Implementation >> Training >> Video Tutorial and using Shared Parameters and Scheduling Door Swings

Search this ThreadSearch this Thread | Page 1 of 1 |

Fri, Jul 31, 2009 at 2:56:50 PM | Video Tutorial and using Shared Parameters and Scheduling Door Swings

#1

dgcad


active
dgcad Avatar

Joined: Thu, Mar 17, 2005
1231 Posts
3.5 Stars: 36 Votes


Below is a link to a video tutorial on using a 'shared parameter' to schedule door swings > ie: RH LH.

 

It would be nice if the door families 'out of the box' read the 'flip control' and managed the swing internally but it's not there. This is a solid manual work around. Some quality control checks must accompany this system however.

 

Other than that, it is a good basic lesson on using 'shared parameters' to schedule any non 'out of the box' data about your families. Cryingkey word being schedule). If you don't need to schedule it then you don't need it to be a shared parameter.

 

http://www.youtube.com/watch?v=qRozIapb7O0 


-----------------------------------

.

FULL 'DOWNLOAD ACCESS' to all 850+ CADclips videos for only $150

 

This user is offline

View Website

Sat, Aug 1, 2009 at 2:14:08 PM | Video Tutorial and using Shared Parameters and Scheduling Door Swings

#2

jarosa


active
jarosa Avatar

Joined: Mon, Feb 18, 2008
251 Posts
4 Stars: 5 Votes


Daryl,

Good video as usual. Just a note though. You have the door swing designations wrong. For an office or standard room, if you are facing the door on the swing side and the handle is on the right, it's a right hand door. It would be a left hand reverse if it swings out of the room (a good example is a store room door that swings out into the corridor). In this scenerio even if the handle is on the right it would be designated by LHR. The difference between RH and LHR is important when specifying hardware. Many commercial locks are not reversible. You most likely knew this but I thought a new desinger/draftsperson may miss this subtle error.

Thanks for contributing another video.

John


This user is offline

View Website

Sat, Aug 1, 2009 at 6:17:48 PM | Video Tutorial and using Shared Parameters and Scheduling Door Swings

#3

dgcad


active
dgcad Avatar

Joined: Thu, Mar 17, 2005
1231 Posts
3.5 Stars: 36 Votes


Fair enough. Thanks for the clarification.

-----------------------------------

.

FULL 'DOWNLOAD ACCESS' to all 850+ CADclips videos for only $150

 

This user is offline

View Website

Search this ThreadSearch this Thread | Page 1 of 1 |



Similar Threads

Thread/Thread Starter

Forum

Last Post

Replies

Door parameters not scheduling or tagging in double door.

Revit Building >> Technical Support

Mon, Sep 26, 2011 at 3:29:50 PM

5

Scheduling Door Material with yes/no Paramters

General Discussion >> Revit Project Management

Fri, Dec 16, 2011 at 10:24:05 AM

7

Door swings in RCP

Revit Building >> Technical Support

Thu, Jul 18, 2019 at 5:03:06 PM

1

creating double door with multiple swings

Revit Building >> Technical Support

Fri, Oct 31, 2014 at 1:44:28 PM

2

shared parameters

Revit Building >> Technical Support

Mon, Jul 10, 2006 at 9:16:17 PM

1

Site Stats

Members:

1990481

Objects:

22877

Forum Posts:

152180

Job Listings:

3

Sponsored Ads

Home | Forums | Downloads | Gallery | News & Articles | Resources | Jobs | Search | Advertise | About RevitCity.com | Link To Us | Site Map | Member List | Firm List | Contact Us

Copyright 2003-2010 Pierced Media LC, a design company. All Rights Reserved.

Page generation time: 1.1491

Login

User Name:

Password:

Remember Me  

Forgot Password?

Search Forums

Advanced Search

Search Forums

Advanced Search


Clear Highlights


Clear Highlights