|
|
|
Home | Forums |
Downloads | Gallery |
News & Articles | Resources |
Jobs | FAQ |
| Join |
Welcome !
|
607 Users Online (13 Members):
Show Users Online
- Most ever was 3914 - Wed, Aug 26, 2026 at 4:53:14 AM |
Forums
|
Forums >> Revit Building >> Technical Support >> how to connect monolithic stair to f.c. slab
|
|
|
active

Joined: Mon, Oct 9, 2006
58 Posts
 |
Hi everybody Does anybody know a way to connect a f.c. slab (with some layering on it for example) to the lower part of a f.c. (monolithic) stair? On the upper part of the stair there is no problem, "end with riser" optio uncheck stair finishes and slab starts almost perfectly. (Not perfect, because I cannot "join geometry" and diminish the line between the slab and stair.) (PIC-1) But at the lower part of stair, "start with riser" option comes up with two almost the same results. When i extend the last riser line, Revit just extends the "tread" not the construction underneath (PIC-2 left side) I want my concrete stair to sit on and connect perfectly to my concrete slab on lower part. I wanna achieve sth like that in PIC-3.
Edited on: Fri, Apr 17, 2009 at 2:40:27 PM
|
This user is offline |
|
 |
 |
Similar Threads |
|
Revit Architecture 2013 - Known Issues |
Revit Building >> Technical Support
|
Fri, Apr 6, 2012 at 7:02:23 AM
|
0
|
|
Slab vs. Floor vs. Foundations...Which do I use? |
Revit Building >> Technical Support
|
Mon, Feb 18, 2008 at 2:49:13 PM
|
1
|
|
SDS/2 Connect Now Available For Revit Structure 2014! |
Workflow & Implementation >> API & Third Party Apps
|
Wed, Aug 7, 2013 at 2:11:19 PM
|
0
|
|
monolithic stairs |
Revit Structure >> Technical Support
|
Sun, May 16, 2010 at 6:33:12 AM
|
6
|
|
monolithic stair join at floor slab |
Revit Building >> Technical Support
|
Wed, Sep 24, 2014 at 11:30:35 AM
|
5
|
 |
|
Site Stats
Members: | 2187933 | Objects: | 23399 | Forum Posts: | 152454 | Job Listings: | 0 |
|