RevitCity.com Logo

Home  |  Forums  |  Downloads  |  Gallery  |  News & Articles  |  Resources  |  Jobs  |  FAQ  |  SearchSearch  |  Join  |  LoginLogin

Welcome !

115 Users Online (114 Members): Show Users Online - Most ever was 626 - Mon, Jan 12, 2015 at 2:00:17 PM

 

Forums

Forums >> Revit Building >> Technical Support >> Linked Door Schedule Problems

Search this ThreadSearch this Thread | Page 1 of 1 |

Thu, Jul 3, 2008 at 5:04:06 PM | Linked Door Schedule Problems

#1

cholden


active
cholden Avatar

Joined: Thu, Jul 5, 2007
37 Posts
No Rating


I have read other threads about door schedules and have come to the conclusion that my problem stems from a linked file issue. We have split up our model between us and another firm (we have interior walls, they have exterior and the floor slab - not the best idea but it works alright). We are trying to schedule the doors from both models (interior and extreior) in the same door schedule. Our first problem (without even adding the linked file information in) was splitting the huge/long schedule up which we solved by filtering by "level" and creating 2 separate schedules for 2 separate sheets. This worked fine when it was only our door information. Now with the linked file information included Revit will not allow us to use our filter by "level". It is not even an option in the pull down menu. Our levels are named the same. I don't know if I am missing something important but it seems to be an issue with linking the other file in. Thanks for your help!

Revit 2008

 


This user is offline

View Website

Fri, Jul 4, 2008 at 3:37:38 AM | Linked Door Schedule Problems

#2

KingRevit


active

Joined: Mon, Oct 15, 2007
321 Posts
4 Stars: 12 Votes


.

hi,

yes your right about this but a way around it is to create a shared parameter called "level" make it instance and an interger type, then filter by this shared paramater. a bit of extra work and it isn't automated as you have to tell which level the door is on but can work.Edited on: Fri, Jul 4, 2008 at 3:44:31 AM



Edited on: Fri, Jul 4, 2008 at 3:56:38 AM

This user is offline

 

Search this ThreadSearch this Thread | Page 1 of 1 |



Similar Threads

Thread/Thread Starter

Forum

Last Post

Replies

Door schedule parameters not displaying "room names" from linked revit model.

Revit Building >> Technical Support

Fri, May 15, 2015 at 1:22:11 PM

5

Door Schedule Problems

Revit Building >> Technical Support

Wed, Mar 19, 2008 at 7:27:34 PM

1

Linked Door Schedule

Revit Building >> Technical Support

Mon, Jan 20, 2014 at 2:48:49 PM

8

Door Schdule

Revit Building >> Technical Support

Tue, Jul 9, 2013 at 3:23:33 AM

1

Linked Door Schedules

Revit Building >> Technical Support

Thu, Nov 15, 2012 at 7:13:26 AM

1

Site Stats

Members:

1991258

Objects:

22879

Forum Posts:

152184

Job Listings:

3

Sponsored Ads

Home | Forums | Downloads | Gallery | News & Articles | Resources | Jobs | Search | Advertise | About RevitCity.com | Link To Us | Site Map | Member List | Firm List | Contact Us

Copyright 2003-2010 Pierced Media LC, a design company. All Rights Reserved.

Page generation time: 0.7963

Login

User Name:

Password:

Remember Me  

Forgot Password?

Search Forums

Advanced Search

Search Forums

Advanced Search


Clear Highlights


Clear Highlights